Limited spring run — free tooling on blind-box programs over 24,000 units. Quote by Mar 31.

Get a quote
[email protected] +86 769 0000 0000

-- What we're offering --

Product Categories

Can't find what you need? Tell us — we'll source it for you.

Send the spec, target price and quantity — sourcing options and a quote come back within 48 hours.

Tell us what you need
The factory behind the series

-- Who we are --

The factory behind the series

Since 2011, one site in Dongguan has run the full chain — tooling, casting, paint, QC and packing — for collectible programs shipped to export markets. No trading-company layer: the team that quotes your program runs it.

Get to Know More
20+Years of experience
8M+Units produced yearly
30+Export markets served
48hEngineering response

-- What they're talking about --

Client feedback

-- Proof of work --

Programmes we shipped

12-Design Blind Box Program for a European Retail Chain

12-Design Blind Box Program for a European Retail Chain

48,000 units · 9 weeks ex-works · EN71 + CE

A mid-size EU retail chain needed an own-label blind box series for a spring campaign with a hard launch date. Family mold tooling held unit cost flat across all twelve designs; the chase figure ran at 1:96 as a marketing decision. Final random inspection at AQL 1.5 across three pull dates, with the carton re-engineered mid-program to lift pallet density 14%.

Mascot Figurine Series for a US IP Agency

Mascot Figurine Series for a US IP Agency

1,200 pcs resin limited edition · numbered bases

An IP agency wanted a 1/7 scale resin edition of a client mascot, numbered and certificate-backed, with crowdfunding backers expecting studio-grade paint. We ran three sculpt revision rounds, matched the campaign renders within one Pantone tolerance, and photographed every unit at final QC against its serial number. Zero paint-related support tickets after shipping.

Conference Pin Badge Run on a Three-Week Clock

Conference Pin Badge Run on a Three-Week Clock

10,000 hard enamel pins · 21 days door-to-event

A corporate events team lost their original pin supplier five weeks before a flagship conference. We compressed the normal 25–35 day window to 21 days by running sampling and tooling in parallel under a signed-off risk protocol, air-freighting 60% for the event date and sea-freighting the balance for post-event fulfillment. Both legs cleared customs without detention.